Well, it's been one month and one day since I took delivery, so I thought it would be fitting to start a build thread. I took delivery on December 20, though the kit was completed on December 3. Stewart has a driver get injured and that set them back several days.
Since I live at the end of a 1/2-mile winding gravel driveway, I had to meet the driver at a nearby church to pick up the kit.
When I got it home, I had to get it off of the trailer and onto the dolly. That was a nail-biter...
The first thing I did was notch the tubing to clear the clutch pedal for the Wilwood pedal box.
Then I cleaned and etched the frame and painted it with POR-15 and installed the front suspension.
Then came the Wilwood 6-pot front brakes.
Continued on next post...
Tim
Since I live at the end of a 1/2-mile winding gravel driveway, I had to meet the driver at a nearby church to pick up the kit.
When I got it home, I had to get it off of the trailer and onto the dolly. That was a nail-biter...
The first thing I did was notch the tubing to clear the clutch pedal for the Wilwood pedal box.
Then I cleaned and etched the frame and painted it with POR-15 and installed the front suspension.
Then came the Wilwood 6-pot front brakes.
Continued on next post...
Tim