Factory Five Racing Forum banner
Status
Not open for further replies.
1 - 1 of 1 Posts

·
Senior Member
Joined
·
5,045 Posts
Discussion Starter · #1 ·
The manual indicates that the firewall should be riveted after the 'F's. Do they mean just the aluminum part across the top of the engine bay or does this also include the forward facing parts of the foot boxes? Also, which is the part that should be left loose to feed the loom through later?
 
1 - 1 of 1 Posts
Status
Not open for further replies.
Top